Columbia Metals Report - Lluvia de Oro Mine Update
(TSX:COL) - Shares Outstanding: 92,956,427
Material from Open Pit Added to Leach Pad - Freshly-crushed material on the leach pad currently amounts to approximately 70,000 tonnes, 25,000 tonnes from the Open Pit, 8,000 from the El Pozo prospect, and 37,000 tonnes from the heap proper. Ore continues to be added to the heap from El Pozo. No further tonnage is planned to be trucked from the Open Pit at this time.
Crusher Operations - A large rock fell from the crusher feed hopper on May 23, and landed on one of the travel wheels, breaking the leaf springs on both sides and necessitating the detachment of the entire wheel assembly. Down time was minimal, the spring package will be replaced shortly.
Accessing More Mineable Material - About 15,000 mineable tonnes is estimated to remain at El Pozo to be transported to the crusher. There are about 2,000 tonnes uncrushed on the ground at the crusher. A second lot of samples was delivered to Jacobs' Assay Lab in Tucson on Monday morning, June 2. Read more »